Blending innovation with tradition, Mossfords Memorial Masons’ construction division were proud to contribute their specialist expertise to the Royal Mint Visitor Centre in Llantrisant — a landmark project that celebrates both British heritage and contemporary design excellence.

Working alongside main contractor ISG and Rio Architects, Mossfords were responsible for the installation of new stonework to the building’s central spine wall, a defining architectural feature of the award-winning visitor centre. The cladding project began in April 2016, marking the start of a collaboration that combined technical precision, aesthetic vision, and enduring craftsmanship.

A plaque on the side of a war memorial

ABOVE: The rail system fitted to the spine wall ready for fixing the stone cladding.

CLIENT

MAIN CONTRACTOR

ARCHITECT

MATERIAL

START DATE

Royal Mint

ISG

Rio Architects

Marianna Grey Sandstone

April 2016

DEVELOPER

MAIN CONTRACTOR

MATERIAL

PROJECT VALUE

DATE

Acorn Property Group

Speller Metcalf

Pennant Stone

£16m

July 2017

DEVELOPER

MAIN CONTRACTOR

MATERIAL

PROJECT VALUE

DATE

MODERN SYSTEMS, TRADITIONAL SKILLS

The Marianna Grey sandstone chosen for the project was initially sourced in Germany, fabricated in Poland, and finally finished to perfection at Mossfords’ production facility in Cardiff. This global journey of material and expertise underscores the attention to quality and detail that defines Mossfords’ work.

The stone was installed using a modern rainscreen cladding system, securely fixed to a steel framing system (SFS) and cement particle (CP) board. Each stone panel was attached to a vertical rail system using one-piece, four-way stainless steel clips fixed with Tek screws – ensuring a robust, durable finish designed to last for generations.

BELOW: Fixing the stone cladding to the rails.

A plaque on the side of a war memorial
A plaque on the side of a war memorial

ABOVE: Cladding extended to the outside of the building.

A CONTEMPORARY APPROACH TO TIMELESS DESIGN

Stone cladding has become the natural choice for forward-thinking buildings that need to harmonise with their surroundings, particularly in historic or architecturally rich areas. The Royal Mint Visitor Centre is a shining example of this balance – a modern space that feels rooted in the local landscape, enhanced by the texture and tone of natural stone.

Through projects like this, Mossfords continues to demonstrate how heritage craftsmanship and modern construction innovation can work hand in hand – delivering results that are as beautiful as they are enduring.

A plaque on the side of a war memorial

ABOVE: The stone cladding fixed seamlessly.

BELOW: The new cladding transforms the interior of the building.

A plaque on the side of a war memorial

TALK WITH US

If you are looking to plan a similar stone cladding project to that here at the Royal Mint, contact us below to discuss the possibilities.